                title = "An approach for the practice of risk mitigations for FEI's 
                         microgravity experiments (Part 1)",
            booktitle = "Anais...",
                 year = "2018",
               editor = "Santos, Walter Abrah{\~a}o dos and Rodrigues, Italo Pinto and 
                         Lima, Jeanne Samara dos Santos and Rodrigues, Aline Castilho and 
                         Mateus, Dairo Antonio Cuellar and Moreira, Herbi J{\'u}nior 
                         Pereira and Barbosa, ivan M{\'a}rcio and Ten{\'o}rio, 
                         Pl{\'{\i}}nio Ivo Gama and Toledo, Rafael Cardoso and Pereira, 
                         Yuri Matheus Dias",
         organization = "Workshop em Engenharia e Tecnologias Espaciais, 9. (WETE)",
            publisher = "Instituto Nacional de Pesquisas Espaciais (INPE)",
              address = "S{\~a}o Jos{\'e} dos Campos",
             keywords = "Risk Mitigation, Microgravity, Risk Analysis, Suborbital Flight, 
                         Brazilian Microgravity Programme.",
             abstract = "The subject of the present article is to verify possible 
                         methodologies to mitigate risks in aerospace projects regarding 
                         such specific cases as new developments for future microgravity 
                         missions at Centro Universit{\'a}rio FEI (FEI). The base of this 
                         study is the knowledge and experience acquired in projects in some 
                         microgravity missions in which FEI participated. From mission to 
                         mission different scenarios appeared to the project management, 
                         popping up new barriers to overcome and bringing back old ones to 
                         the present: a set of occurrences in a comprehensive amount of 
                         uncertainties that face the manager skills to deal with. The main 
                         idea of this paper is about the study of some techniques used to 
                         increase the success rate by implementing a risk management 
                         project with the evaluation of possible methodologies for risk 
                         mitigation projects, proposing recommendations related to the 
                         management of aerospace projects based primarily on theory, and 
                         then on known and successful practices adopted in projects already 
                         completed. A fundamental step for the risk comprehension is to 
                         identify the sources of uncertainties and deleterious 
                         consequences, or, in other words, the risk factors. This article 
                         is a fragment of a broader survey that is being elaborated in the 
                         dissertation from one of the authors at the National Institute for 
                         Space Research, at S{\~a}o Jos{\'e} dos Campos, Brazil.",
  conference-location = "S{\~a}o Jos{\'e} dos Campos",
      conference-year = "15-16 ago. 2018",
                 issn = "2177-3114",
             language = "pt",
         organisation = "Instituto Nacional de Pesquisas Espaciais (INPE)",
                  ibi = "8JMKD3MGPDW34R/3SPH9Q2",
                  url = "http://urlib.net/ibi/8JMKD3MGPDW34R/3SPH9Q2",
           targetfile = "44 - [Artigo] Fl{\'a}vio de Azevedo Corr{\^e}a Junior,.pdf",
                 type = "Engenharia e Gerenciamento de Sistemas Espaciais",
        urlaccessdate = "2024, May 17"
}


Close